Start with these eight categories
Treat each line as a prompt to confirm with your GC, not as a universal legal requirement. For example, Portland’s residential permit process includes its own zoning checks, plan review, trade applications, and final inspection. That is a local example, not a rule for projects elsewhere.[2]
Building and zoning approvals
Ask which building permit, land-use review, zoning clearance, or other approval applies to the site and work. Confirm who files, which permit holder is named, and what status or approval record the GC needs from you. Local business location can affect applicable zoning rules, regulations, licenses, and permits.[1]
Plans and submittals
Confirm the current drawing set and revision, specifications, product data, shop drawings, cut sheets, and any deferred submittals your scope touches. Agree on who submits each item and who returns reviewer comments. Portland’s residential process, for example, may ask for plans and additional forms and can send a checksheet when reviewers need corrections.[2]
Trade permits and credentials
Write down the trade work you will perform, then ask whether it needs a separate permit, registration, license, or project credential. Check the issuing authority, responsible permit holder, expiration date, and any credential the GC needs on file. Requirements depend on the activity and location; verify them with the relevant state, county, or city office.[1][2]
Insurance
Ask the GC for its written insurance requirements: requested policy types, limits, certificate holder, additional-insured wording, and dates. Have your broker confirm what your policy provides and send the requested evidence through the channel the GC specifies. Do not assume one project’s limits or endorsements apply to another.
Bonding and tax records
Ask whether the contract calls for a bid, payment, or performance bond, who must furnish it, and when. SBA explains these bond types and notes that some public and private contracts require surety bonds.[5]
Confirm which legal business name and tax form the GC needs. Form W-9 gives a requester a taxpayer identification number for information reporting; use the current IRS form and submit it through an appropriate private channel.[4]
Safety documents
Ask what the GC expects for your task: a site orientation, hazard assessment, job hazard analysis, emergency contacts, training records, equipment inspections, or daily coordination notes. OSHA’s construction guidance covers hazards such as falls, electrical incidents, struck-by events, and trenching; some of its program guidance is recommended practice and goes beyond specific OSHA requirements.[3]
Inspections and closeout
Identify which inspections touch your work, who schedules each one, what must be ready, and where results are recorded. Ask what the GC needs at closeout: final approvals, test records, warranties, operation manuals, photos, or outstanding-item sign-off. Portland’s example permit process uses an inspection card to list likely inspections and says a final approval inspection completes its permit.[2]
Scope-specific checks
Flag work that could involve structural review, fire or life-safety coordination, excavation, site development, utilities, environmental controls, traffic, or special equipment. Ask the GC which additional reviewers, permits, inspections, or plans apply before you schedule the work. Portland’s process illustrates how site conditions and proposed work can bring in different review groups; that example is specific to Portland.[2][3]
Before work starts
Verify the job with the people who issue the rules.
Requirements vary by location, project type, and scope. Check with the local building or planning department and the relevant trade licensing authority, and confirm contract-specific requests with the GC. This guide is general information only; it is not jurisdiction-specific legal or compliance advice and is not a substitute for official instructions or professional advice.[1][2]
Keep the permit checklist with the job.
Open Jobs, sign in if prompted, choose a job, then open its Permit checklist. Your existing job access rules still apply.
Sources
- [1]Launch your business
U.S. Small Business Administration. Explains that business location affects applicable zoning, regulations, licenses, and permits.
- [2]New Single Family Residence (NSFR) and New Detached ADUs
Portland Permitting & Development. A Portland-specific example of plans, trade applications, zoning review, inspections, and final approval.
- [3]eTool: Construction - Preventing Fatalities
Occupational Safety and Health Administration. Construction hazard topics and safety-program guidance, including practices that can go beyond specific OSHA requirements.
- [4]About Form W-9, Request for Taxpayer Identification Number and Certification
Internal Revenue Service. Describes Form W-9 as the way a requester obtains a taxpayer identification number for information reporting.
- [5]Surety bonds
U.S. Small Business Administration. Describes bid, payment, and performance bonds and explains that some contracts require surety bonds.